This project was executed on 840 m2 land in Tehran which consisting of two towers including 13 floors with total substructure over 6600 m2.This project with all of its equipments including air conditioning system, four elevators and fire suppression system was completed in 1996.
Client: Ministry Of Energy
Engineering Consultant: Iran Boland Saze Company(SABA Co.)
Start Date: 1992
End Date: 1996
View the embedded image gallery online at:
http://ahabco.ir/en/projects/123-executed-projects/building-projects/346-satkab-co-administration-complex-building.html#sigProId9c97a4476c
http://ahabco.ir/en/projects/123-executed-projects/building-projects/346-satkab-co-administration-complex-building.html#sigProId9c97a4476c